Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry

Mostra el registre complet Registre parcial de l'ítem

  • dc.contributor.author De Armas, Jésica
  • dc.contributor.author Laguna, Manuel
  • dc.date.accessioned 2024-02-12T06:55:39Z
  • dc.date.available 2024-02-12T06:55:39Z
  • dc.date.issued 2020
  • dc.description.abstract We develop a solution procedure for a production problem that involves the optimal lot-sizing and scheduling of multiple products on parallel machines over a long planning horizon. The objective is to determine the product assignment, production quantities, and production sequence on each machine in order to meet demand and maximise the total production amount in a given planning horizon. We study this problem in the context of the manufacturing of pipe insulation, in which multiple features have to be considered simultaneously. The solution procedure combines mathematical programming and a post-processing sequencing heuristic. We also develop a procedure to determine safety stock levels and use Monte Carlo simulation to assess the risk associated with inventory shortages due to stochastic production rates. Computational tests are performed on both real and artificially-generated data.
  • dc.format.mimetype application/pdf
  • dc.identifier.citation de Armas J, Laguna M. Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry. Int J Prod Econ. 2020;58(3):800-17. DOI: 10.1080/00207543.2019.1600763
  • dc.identifier.doi http://dx.doi.org/10.1080/00207543.2019.1600763
  • dc.identifier.issn 0925-5273
  • dc.identifier.uri http://hdl.handle.net/10230/59068
  • dc.language.iso eng
  • dc.publisher Taylor & Francis
  • dc.relation.ispartof International Journal of Production Research. 2020;58(3):800-17
  • dc.rights © This is an Accepted Manuscript of an article published by Taylor & Francis in International Journal of Production Research on 29 Jun 2018, available online: http://www.tandfonline.com/10.1080/00207543.2019.1600763
  • dc.rights.accessRights info:eu-repo/semantics/openAccess
  • dc.subject.keyword Scheduling
  • dc.subject.keyword Parallel machines
  • dc.subject.keyword Lot sizing
  • dc.subject.keyword Setup times
  • dc.subject.keyword Shared resources
  • dc.subject.keyword Stochastic production rates
  • dc.title Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry
  • dc.type info:eu-repo/semantics/article
  • dc.type.version info:eu-repo/semantics/acceptedVersion