Solving a concrete sleepers production scheduling by genetic algorithms

dc.contributor.authorPérez Vázquez, María Elena
dc.contributor.authorGento Municio, Angel Manuel
dc.contributor.authorRamalhinho-Lourenço, Helena
dc.date.accessioned2020-12-01T08:55:48Z
dc.date.available2020-12-01T08:55:48Z
dc.date.issued2007
dc.description.abstractPRECON S.A. is a manufacturing company devoted to produce prefabricated concrete parts for several industries as railway transportation and agricultural industries. Recently, PRECON S.A. signed a contract with RENFE, the Spanish National Railway Company, to manufacture pre-stressed concrete sleepers for the sidings of the new railways of the high speed train (AVE). The scheduling problem associated with the manufacturing process of the sleepers is very complex, since this involves several constraints and objectives. These constraints are related to production capacity, the quantity of available moulds, demand satisfaction and other operational constraints. The two main objectives are related to the way to maximize the utilization of manufacturing resources and minimize mould movements. We developed a deterministic crowding genetic algorithm for this multiobjective problem. The algorithm has proved to be a powerful and flexible tool to solve large-scale instances of this real and complex scheduling problem.en
dc.description.sponsorshipThe authors gratefully acknowledge the financial support form VA102/04 project, Consejería de Educación y Cultura, Junta de Castilla y León, Spain.
dc.format.mimetypeapplication/pdf
dc.identifier.citationPérez-Vázquez ME, Gento-Municio AM, Lourenço HR. Solving a concrete sleepers production scheduling by genetic algorithms. Eur J Oper Res. 2007 Jun 16;179(3):605-20. DOI: 10.1016/j.ejor.2005.03.070
dc.identifier.doihttp://dx.doi.org/10.1016/j.ejor.2005.03.070
dc.identifier.issn0377-2217
dc.identifier.urihttp://hdl.handle.net/10230/45918
dc.language.isoeng
dc.publisherElsevier
dc.relation.ispartofEuropean Journal of Operational Research. 2007 Jun 16;179(3):605-20
dc.rights© Elsevier http://dx.doi.org/10.1016/j.ejor.2005.03.070
dc.rights.accessRightsinfo:eu-repo/semantics/openAccess
dc.subject.keywordGenetic algorithmsen
dc.subject.keywordSchedulingen
dc.subject.keywordDeterministic crowdingen
dc.subject.keywordMultiobjectiveen
dc.titleSolving a concrete sleepers production scheduling by genetic algorithmsen
dc.typeinfo:eu-repo/semantics/article
dc.type.versioninfo:eu-repo/semantics/acceptedVersion

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
perez_eurjopre_solvi.pdf
Size:
372.81 KB
Format:
Adobe Portable Document Format